Title
Risk/investment-driven transmission expansion planning with multiple scenarios
Date Issued
01 January 2013
Access level
metadata only access
Resource Type
journal article
Author(s)
Rahmani M.
Romero R.A.
Rider M.J.
Abstract
This study presents a new methodology based on risk/investment to solve transmission network expansion planning (TNEP) problem with multiple future scenarios. Three mathematical models related to TNEP problems considering multiple future generation and load scenarios are also presented. These models will provide planners with a meaningful risk assessment that enable them to determine the necessary funding for transmission lines at a permissible risk level. The results using test and real systems show that the proposed method presents better solutions compared with scenario analysis method. ©The Institution of Engineering and Technology 2013.
Start page
154
End page
165
Volume
7
Issue
2
Language
English
OCDE Knowledge area
Matemáticas
Scopus EID
2-s2.0-84880694555
Source
IET Generation, Transmission and Distribution
ISSN of the container
17518687
Sources of information:
Directorio de Producción Científica
Scopus