Title
Production model for the reduction of order delivery time in a peruvian metalworking company based on the six sigma dmaic methodology
Date Issued
01 January 2021
Access level
metadata only access
Resource Type
conference paper
Author(s)
Espinoza-Cuadros A.
Criollo Marcavillaca M.
Mendoza-Vargas P.
Alvarez J.
Publisher(s)
Springer
Abstract
The present research work has as objective the application of Six Sigma DMAIC methodology in the production’s processes, the results will be manifested in increasing the efficiency of the production system and in reducing the delay in order delivery. In a metal mechanic company dedicated to the manufacture of electrical boards which focus is the terraced boards there was presented a fulfillment rate failure to deliver on time 46%. On the other hand, the delivery delay is generated because the current productivity does not supply what is required by the customer, therefore a minimum 394 units per month is needed to meet the requirements but currently only produce 226 units per month. For solve this problem it was proposed that Production model that merges the painting and baking areas and that generates an impact on the entire painting operation.
Start page
606
End page
611
Volume
1253 AISC
Language
English
OCDE Knowledge area
Ingeniería industrial
Scopus EID
2-s2.0-85089628657
Source
Advances in Intelligent Systems and Computing
Resource of which it is part
Advances in Intelligent Systems and Computing
ISSN of the container
21945357
ISBN of the container
978-303055306-7
Conference
3rd International Conference on Human Interaction and Emerging Technologies: Future Applications, IHIET 2020
Sources of information: Directorio de Producción Científica Scopus