Title
Corrective analysis of transient instabilities for PMU in the Peruvian Center-South Transmission System
Date Issued
15 September 2021
Access level
metadata only access
Resource Type
conference paper
Publisher(s)
Institute of Electrical and Electronics Engineers Inc.
Abstract
Our research proposed a methodology for detecting transient instability failures in dynamic simulations for Peruvian Center-South Transmission System. Our findings are disconnection time up to 190ms for 500 kV in overhead lines, an interrupted power greater than 32 MW and the type of line according to its voltage (500 kV) [1]. The case study is the disconnection of line 5011 (Chilca Nueva-Fenix), which had a replacement time of 4h 14 min and an interrupted power of 529.6 MW; obtaining a critical angle of 1.26 rad and a time saving of 4.75 s.
Language
English
OCDE Knowledge area
Ingeniería eléctrica, Ingeniería electrónica
Subjects
Scopus EID
2-s2.0-85117596357
ISBN of the container
978-166544421-7
Conference
2021 IEEE PES Innovative Smart Grid Technologies Conference - Latin America, ISGT Latin America 2021
Sources of information:
Directorio de Producción Científica
Scopus