Title
Higher order interior-point method for minimising load-shedding in a competitive electric power market
Date Issued
01 July 2004
Access level
metadata only access
Resource Type
conference paper
Author(s)
Rider M.J.
Castro C.A.
Paucar V.L.
Garcia A.V.
Abstract
A method for computing minimum load shedding in a competitive electric power market is proposed. The minimum load-shedding problem is formulated as an optimal power flow (OPF), including equality and inequality nonlinear constraints which take into account the system's security conditions. A multiple predictor-corrector (MPC) higher order interior-point method was implemented and tested. The utilisation of an MPC method leads to both a smaller number of iterations for convergence and smaller computational times. The idea is to determine individual load-shedding percentages for each busbar to assure predefined security conditions. Several test power systems were used in the simulations, namely the IEEE 30, 57, 118 and 300 busbar systems. Also, two realistic power systems were used, a 464 busbar, corresponding to the interconnected Peruvian system, and a 2256 busbar corresponding to part (South-Southeast) of the interconnected Brazilian system. An analysis of the dual variables related to the optimisation problem is also carried out.
Start page
433
End page
440
Volume
151
Issue
4
Language
English
OCDE Knowledge area
Ingeniería eléctrica, Ingeniería electrónica
Scopus EID
2-s2.0-4544373282
ISSN of the container
13502360
Conference
IEE Proceedings: Generation, Transmission and Distribution
Sources of information: Directorio de Producción Científica Scopus